In collaboration with the technical company ‘THEMELIODOMI SA’ We studied, designed, constructed, installed and put into operation the:
- Rethymnon wastewater treatment facilities: Eight networked programmable logic controllers Siemens Step 5 with Sinec L1 (TTY) network, remote controls, SCADA station.
- Volos wastewater treatment facilities: Eight networked programmable logic controllers Siemens Step 5 with Sinec L2 (Profibus) network, interface with serial connection.
- Wastewater treatment plants of Patras: Fourteen programmable logic controllers Siemens Step 7 networked with Sinec L2 (Profibus) network , where eight “smart” units are connected. Radio network Profibus. Double SCADA for increased reserve.
- Sewage treatment facilities in Thessaloniki: Eight networked programmable logic controllers Siemens Step 5 with Ethernet fiber backbone network and local Sinec L2 islets (Profibus), where seventeen programmable logic controllers Siemens Step 5 are connected. Profibus radio network, SCADA station.
- Wastewater treatment facilities of Veria: Eight networked programmable logic controllers Siemens Step 5 with Sinec L2 (Profibus) network, interface with serial connection.
- Agrinio wastewater treatment facilities: Five networked programmable logic controllers Siemens Step 5 with Sinec L2 (Profibus) network, interface with optical connection 15km.
- Sewage treatment plants of Chania: Two programmable logic controllers Siemens Step 7.
- Pre-treatment plants of Psytallia effluent E.Y.D.A.P.: Two networked programmable logic controllers Siemens Step 7. with Profibus network via modem. One of the first ASI (Actuator Sensor Interface) installations in Greece. Dual SCADA WinCC increased backup.
- Navy base service facilities N.A.T.O. Souda: Four networked programmable logic controllers Siemens Step 5 with Sinec L2 (Profibus) network. SCADA WinCC station.
- Wastewater treatment facilities in Ioannina: Eight networked programmable logic controllers Siemens Step 7 with Profibus optical network, where eight “smart” units are connected. Triple SCADA station.
- Wastewater treatment facilities of Tsantali Winery: Programmable logic controller Siemens Step 5.
Also:
- Continuous support in matters of operation and maintenance in the watsewater treatment plants of the cities of Xanthi, Ioannina, Veria and Rethymnon
- In collaboration with the technical company ‘J&P AVAX’, we designed, built, installed and commissioned the second phase of the airport wastewater treatment plant “Elefth. Venizelos” with three programmable logic controllers Simatic Step 7-300.
- In collaboration with the technical company ‘Michael Tsontos SA’, we studied, designed, constructed, installed and put into operation sewage pumping stations in the tourist area of Chania and expanded the biological wastewater treatment plants in the tourist area of Chania, Crete (six pumping stations Simatic Step 7-200 and two panels in the EEL Simatic Step 7-300, SCADA WinCC).
- On behalf of the consortium “Foundation Passavant Employment” we delivered the automation of the water and sewage pumping stations of Rethymnon with nine pumping stations equipped with Simatic Step 5 connected to 3964 R (point to point-hub). Dual SCADA Coros LS and WinCC.
- On behalf of the thechnical company “Ergodomi SA” we studied, designed, manufactured, installed and put into operation the supervision automation (Simatic Step 7-300 WinCC flexible) of the Landfill. Amariou Rethymno.
- On behalf of the consortium of technical companies «Bilfinger Berger Elector, Mediterranean SA» We studied, designed, installed and put into operation the operation automation and SCADA of the Landfill. Tagaradon Thessaloniki (four Simatic Step 7-200 in Profibus & SCADA WinCC flexible).
- On behalf of the company “Nikolaidis – Partalas” we delivered the automation of sewer pumping stations in Evros equipped with ABB PLC connected with Modbus wireless connection. SCADA WinCC flexible.
- On behalf of the consortium of technical companies “J / V ME.KON. SA – DOMIKI XANTHIS – DIMITREIOS SA » we studied, designed, installed and put into operation the operation automation and SCADA of the wastewater treatment plants of the Municipality of Xanthi.
- On behalf of “AKTOR SA” studied, we planned installed and started operating the operation automation and SCADA of water pumping stations, drainage, irrigation and drinking water management facilities and sewage on the hotel «Costa Navarino» Pylos Messinia (four Simatic Step 7-300, two S7-200, five S7-1200 in Optical Ethernet, GSM & SCADA WinCC)
- We studied and designed the automation and electrical installation of the wastewater treatment plant of the Motor Oil refinery.
- With PLC ABB PLC we studied and installed the networked automation in a feed factory of Athienou, Cyprus.
- In Bucharest, Romania we studied and installed in networked automation in amusement park (pumping stations, swimming pools, water slides, BMS security κ.α.) with 28 Siemens PLC in optical Ethernet network and dual SCADA WinCC.
- In Lefkimi Corfu studied and installed networked, with Ethernet automation, five Siemens PLC in biological treatment and five pumping stations with radio links to 2,4 GHz, with control center – SCADA WinCC σin E.E.L. All electrical panels biological treatment studied and were installed by us.
- In the area of Serres we studied and installed four networked with Ethernet pumping stations with automation and ABB materials, 2.4 GHz radio network and ABB SCADA.
- In Gouves, Heraklion, we studied, developed and completed the biological treatment plant.
- In Arkalochori, Heraklion, we study, develop and deliver the biological treatment plant.
- In the Municipality of Dikaio of N. Kos we study, develop and deliver the biological treatment plant for J&P.
- In Rethymno we study, develop and deliver the third phase of the biological treatment plant for Aktor SA. – Ergodomi SA.
- In the Municipality of Paggaio we study, develop and deliver the biological treatment plant.
- In Aegina we study, develop and deliver the automation of water pumping stations North. Aegina for the Route SA.
- In the area of Lake Carla in Thessaly we study, develop and deliver the automation of thirty (30) water pumping stations of DEYAMB for P&C Development.
Your own work…
- In collaboration with the technical company ‘AKTOR SA’ we studied, designed, built, installed and put into operation the concrete production complex in the mines of “Hellenic Gold”. (Simatic Step 7-300 & SCADA ProTool)
- We studied, designed, programmed and put into operation management systems of LIDL store buildings with Simatic Step 7
- On behalf of insulating materials manufacturing company “FIBRAN A.E.” we studied, designed, built, installed and put into operation the electrical support panels and the automations in the new mineral wool production unit in Terpni, Serres. (four Simatic Step 7-300 in Profibus & SCADA WinCC)
- On behalf of the fertilizer production company “LIFE-T” we studied and put into operation the new automations of the production line with spectacular results.
- On behalf of the flexible packaging company “Alfa Beta Roto SA” we modernized the multicolor printing machine, with the immediate next step being the upgrade to modern automation (Step 7).
- We studied and installed and put into operation the supervision automation (Simatic Step 7-300 & SCADA WinCC flexible) of the emergency fields and substation operations at Papageorgiou Hospital in Thessaloniki.
- On behalf of the chemical production company “Hatziloukas” we built, installed and put into operation the operation automation (Step 7) and converted the existing monitoring system (SCADA), of the new refrigeration unit.
- In collaboration with the technical company ‘THEMELIODOMI SA’ we studied, designed, built, installed and put into operation the building management systems:
1. Science dissemination center and technology museum of Thessaloniki
2. Private Clinic Genesis (Siemens Building Technologies BMS)
3. Kaftanzogleio National Stadium (Simatic Step 7-300 on Ethernet)
4. Sports Stadium Aris (Vikelidis Simatic Step 7-300)
In collaboration with the technical company ‘THEMELIODOMI SA’ we designed, designed, built, installed and operated the traffic management systems:
1. Municipal parking station of Veria (Simatic Step 7-300)
2. Tunnels “Egnatia Odos SA” Asprovaltas (Simatic Step 7-300)